Water utilities and treatment plants need to understand where electricity goes before deciding which equipment to improve. A site total provides an overview. However, separate readings can reveal how consumption changes across pumps, blowers, treatment stages, and building services.

For engineering contractors and procurement teams, a useful metering package must connect electrical measurements with operating records. It should also fit the control panels and exchange data with the project’s monitoring system.

This guide explains what to specify when purchasing energy meters for pumping stations and wastewater facilities.

Map Electricity Use to the Water Process

Begin with a load list and a clear electrical boundary for each measurement point.

At a pumping station, separate records may be needed for duty pumps, standby pumps, and auxiliary equipment. A wastewater plant may also need readings for aeration blowers, sludge equipment, and other treatment loads.

Prioritize points that answer a defined operating question. For example, a dedicated pump-feeder meter can support a review of electricity consumed during a known pumping period.

Then check the drawings against the installed circuits. A feeder supplying several pumps will provide a combined reading unless additional measurement points are included.

Match the Meter to the Pump Circuit

Provide the manufacturer with the supply voltage, phase arrangement, current range, connection method, and installation conditions.

Saving Meter’s DTSU1218 three-phase DIN rail energy meter lists energy measurement and monitoring of voltage, current, power, and power factor. Its published communication functions include RS485 with Modbus and DL/T 645 support.

For larger feeders, specify the required current-transformer arrangement and meter input. Also state the accuracy requirements for the intended use.

Where variable-speed drives are installed, identify the proposed measurement location. Ask the supplier to confirm suitability for the voltage, frequency, and waveform at that point before approving the configuration.

Combine Electrical Readings with Flow and Head Data

Electricity consumption alone does not establish pumping efficiency. A useful assessment also needs flow and head information. DOE pumping guidance uses electrical measurements alongside hydraulic operating data when assessing system performance.

A practical operating indicator is:

Electricity intensity = metered electricity consumption ÷ water volume moved during the same period

For example, an illustrative station consuming 300 kWh while moving 1,000 m³ records 0.30 kWh/m³.

State which pumps and auxiliary loads the calculation includes. Obtain water volume from a suitable flow measurement source; it should not be assumed available from the electricity meter.

Furthermore, compare results under similar operating conditions. Changes in lift, pressure requirements, or flow can affect the interpretation.

Keep Treatment Performance in the Review

A wastewater facility’s electricity report should reflect the treatment work being performed.

Ask the reporting team to include relevant flow, process, and operating information alongside electrical readings. DOE resources identify energy data management and benchmarking as parts of tracking wastewater energy performance.

For procurement, define which external records the system must accept and who supplies them. Examples may include blower operating hours, pump status, flow totals, and maintenance notes.

Use changes in electricity consumption to guide investigation. Any adjustment to treatment equipment should follow the plant’s approved process requirements.

Specify Data Collection for Remote Stations

Remote sites need a defined route from each meter to the receiving system.

Saving Meter’s RTU1218 power data gateway lists downstream LoRa collection, an RS485 interface, and upstream 4G communication. It also lists a mechanism for detecting and resending missing data.

Confirm compatibility with the selected meters and server before ordering. Include communication protocols, data fields, upload intervals, and local network conditions in the review.

Also agree on how the receiving platform displays delayed or missing readings. A communications gap should remain distinguishable from a stopped pump.

Review the Cabinet Environment

Meter selection should account for the conditions inside the enclosure.

Saving Meter’s DTSU1218 installation guidance calls for a dry, ventilated location and protective housing where contamination or physical damage is a concern.

Therefore, provide the supplier with cabinet temperature, moisture conditions, available space, and any site-specific environmental requirements.

For wet wells, outdoor stations, or corrosive areas, have the project engineer define the enclosure and installation requirements. Confirm those requirements against the exact meter configuration rather than relying on a general product description.

Define Acceptance Tests Before Delivery

An agreed test plan gives the buyer and supplier a clear handover target.

Test area Acceptance requirement
Circuit identification Each reading maps to the correct pump or equipment group
Current scaling Meter, CT, and software settings produce the agreed values
Data transfer Required readings reach the intended system
Time alignment Electrical and flow records cover matching periods
Connection recovery The system handles interrupted communication as specified
Reporting Units, measurement boundaries, and data gaps are clear

Test a representative installation before expanding across the site. Include both electrical staff and the team responsible for operating reports.

Evaluate the Manufacturer’s Delivery Scope

A complete quotation should identify meters, accessories, data collection equipment, configuration work, documents, and support responsibilities.

Saving Meter’s DTSU1218 description identifies dedicated integrated circuits and SMT production technology. Jiangsu Saving Electronics Co., Ltd. also lists metering equipment, data acquisition devices, cloud software, system integration, and operation and maintenance services.

Ask for model-specific drawings, communication documents, and the agreed configuration record. Where project approvals are required, confirm the supporting documents for the exact model and application.

Finally, separate equipment delivery from installation and commissioning in the purchase scope.

Prepare a Pump Station Metering Inquiry

Send the manufacturer the electrical drawings, pump and blower load list, meter quantities, CT requirements, cabinet conditions, and communication architecture.

Include available flow data, required report examples, acceptance criteria, and the delivery schedule. These inputs help connect product selection with the project’s operating needs.

Explore Saving Meter’s energy metering products and services to discuss a metering package for your water or wastewater project.